ABSHERON EPS

Client: Jocap Absheron

Location: Azerbaijan

My Contribution:

​1. 4 Jackets Fabrication (Estimate Weight = 4 x 300 MT)

  • Develop lifting plan and procedure

  • Develop transportation plan and procedure

  • Design grillage and load-out support

​

2. Topside Modules (Estimate Weight = 3 x 1100 MT)

  • Develop fabrication sequences

  • Design assembly support

  • Develop lifting plan and procedure for main decks lifting to SPMT

  • Develop transportation plan of main decks

  • Develop lifting plan and procedure for main decks lifting to assembly support

  • Develop lifting plan for secondary structures installation

  • Develop lifting plan and procedure for equipment installation

  • Design lifting aid (spreader bar, padeye, trunnion, etc)

  • Develop weighing procedure, analysis and report

  • Design load-out support

  • Develop transportation plan and procedure for movement to load-out area

​

3. Bridges (Estimate Weight = 7 x 100 MT)

  • Develop fabrication sequence

  • Design assembly support and grillage for transportation and load-out

  • Develop weighing procedure, analysis and report

​

4. Vent Boom Tower (Estimate Weight = 130 MT)

  • Develop fabrication sequence

  • Design assembly support and grillage for transportation and load-out

  • Develop weighing procedure, analysis and report

  • Develop transportation and lifting plan and procedure

​

5. Vent Bridge (Estimate Weight = 120 MT)

  • Develop fabrication sequence

  • Design assembly support and grillage for transportation and load-out

  • Develop weighing procedure, analysis and report

  • Develop transportation and lifting plan and procedure

2CDC8D7D-A9AF-4931-820F-00E824DAD256_edi

JANGKRIK SUBSEA COMPLEX PROJECT

Client: FMC Technologies

Location: Indonesia

My Contribution:

  • Develop fabrication layout by considering safety and access for equipment

  • Design assembly and load-out support for Manifold Module, Manifold Support Structure, Caisson Closed Foundation, Mudmat, SSIV Module and Mudmat, and Umbilical

  • Develop transportation and lifting plan

  • Develop SIT/FAT procedure

C35613A7-48BA-46C8-840B-DF8E71A6F2E3_1_105_c.jpeg

ICHTHYS GAS/CONDENSATE DEVELOPMENT PROJECT

Client: INPEX

Location: Indonesia

My Contribution:

1. RSS Tower Foundation (Estimate Weight = 4 x 500 MT)

  • Design assembly support

  • Develop lifting plan for side wall structure installation

  • Develop transportation plan and procedure from workshop to assembly location

  • Develop lifting plan and procedure for overturning during at assembly area

​

2. RSS Tower (Estimate Weight = 7500 MT)

  • Perform sikdway analysis and arrangement for RSS tower fabrication

​

2. Riser Arch (Estimate Weight = 2 x 871 MT)

  • Design assembly support and load-out support

  • Develop weighing plan and procedure

  • Develop transportation and lifting plan and procedure for load-out

​

3. Gas Export Riser Base Module (Estimate Weight = 725 MT)

  • Design assembly support and load-out support

  • Develop transportation and lifting plan and procedure for FAT/SIT and load-out

​

4. CPF Pile (Estimate Weight = 461 MT)

  • Design temporary support

  • Develop transportation and lifting procedure for offloading and preservation

​

5. FPSO Pile (Estimate Weight = 491 MT)

  • Design temporary support

  • Develop transportation and lifting procedure for offloading and preservation

Riser Arch Transportation.jpeg

KEPODANG GAS FIELD DEVELOPMENT PROJECT

Client: Petronas Carigali

Location: Indonesia

My Contribution:

1. CPP Jacket (Estimate Weight = 2745 MT)

  • Perform structural analysis for jacket structure during fabrication

  • Develop lifting plan, transportation plan and procedure for legs installation to launch-runner

  • Develop lifting plan and procedure for elevation panel installation

  • Develop roll-up procedure for naked and loaded bent structure including rigging plan, tie-back arrangement and crane arrangement

  • Develop lifting plan and procedure for rigging platform installation

  • Develop rigging plan, design trunnion, winch arrangement, and procedure for load-out

​

2. CPP Topside (Estimate Weight = 3022 MT)

  • Develop lifting plan and procedure for elevation panel installation

  • Develop lifting plan for equipment installation

  • Develop pulling arrangement and procedure for load-out

​

3. WHT-C Jacket (Estimate Weight = 1000 MT)

  • Perform structural analysis for jacket structure during fabrication

  • Design assembly support

  • Develop lifting plan, transportation plan and procedure for legs lifting to assembly support

E44B35CE-5750-4774-BEB7-F41D4114963C_1_1